What Concrete Forest of Dean Costs to Order

When placing an order for ready mix concrete, the cost will vary depending on several factors that need to be taken into account when placing an order.

Volume Minimums and Short-Load Fees

The minimum order quantity for ready mix concrete is typically around 3 cubic meters, although this can vary. Orders below this are often charged at a short-load rate, usually between £50 and £150 extra for part-filling a mixer on a lorry.

Mix Grade Affects the Price

A C20 mix for a garden path would be less expensive than a C35/40 mix for a driveway or structural foundation, but only if used correctly. A stronger mix means more expensive materials, so use the appropriate mix for the job at hand.

Distance and Site Access

Delivery costs vary based on how far you are from the nearest batching plant. Generally, suppliers include local delivery within a tight area, and charge for longer journeys by mileage. Difficult access to a site, such as down a narrow lane, up a steep slope or through a small gate can also incur additional costs. More on Concrete Forest Of Dean can be found at https://www.monstermixconcrete.co.uk/concrete-forest-of-dean.

Timing Can Add a Surcharge

Weekend or out-of-hours deliveries can incur an additional charge of up to £100 or more for a single delivery. Thus, try to arrange for a delivery during working hours where possible.

Check Planning Before You Pour

Check Planning Before You Pour. Ensure that your project has planning permission before you order ready mix concrete especially for new driveways and outbuildings.

By ensuring you have ordered the correct mix, volume and time of delivery for your project you can ensure that the invoice you receive is as you expected.